Case Study
Tuesday, September 26
10:15 AM - 10:45 AM
Live in Berlin
Less Details
Switching from PAS-X V2 to PAS-X V3.2 within a fully utilized production area is a big challenge. Migrating additionally 3.500 MBRs to the new system is an even bigger challenge. Find out how Boehringer Ingelheim has managed the MES system change with a focus on MBR migration for the biopharmaceutical drug substance area at site Biberach.
This presentation covers:
Working within pharmaceutical industry since 2015, responsible for different MES projects since >5 years.
Now leading the MES migration project at Boehringer Ingelheim site Biberach.