• Member of executive management team driving operations vision and strategy, increasing revenue by 160%.
• Lead equipment and facility innovation, development, implementation, and life cycle of new expansions.
• Led six mechanical and controls engineers, and 40 indirect electro-mechanics, operating equipment 24/7.
• Orchestrated installation of 30 dispensers and 17 packagers, dispensing 650K doses/day across 9 pharmacies.
• Led expansion buildout of 7 pharmacies (300K+ sq ft), all under budget, and met timeline for grand openings.
• Redesigned automated medication dispensing system and installation, reducing costs by 36% ($1.8M savings/site).
• Streamlined FAT/SAT testing procedures that reduced processing time and resource demands by 50%.
• Improved machine setup and operator trainer, reducing Paxit medication waste 68% ($1M+ annually).
• Replicated setup and operator training at next site, improving OEE from 46% to 88%.
• Implemented CMMS system to track preventive maintenance and spare parts reducing downtime by 18%.
• Envisioned and led automation design and build of packagers, at 26% less than previous machines.
• Awarded patents for blister-pack packaging machines in 2019.